Skip to content
Federalawarded

USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement

SOUTHWEST REGIONAL MAINT CENTER

SOUTHWEST REGIONAL MAINT CENTER (federal) has posted a notice about "USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement". This opportunity is awarded. The notice does not list a small business set-aside. Solicitation number: N5523626R0009.

Bids dueNot stated

The short version

RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references,...

Agency
SOUTHWEST REGIONAL MAINT CENTER
Level
Federal
Solicitation number
N5523626R0009
Notice type
other
Posted
Nov 4, 2026
Set-aside
None stated
Estimated value
$3,404,927
NAICS
333618

Contact

MIRA MAJE Brown · (619) 708-0826 miramaje.c.brown.civ@us.navy.mil

Summary from the public posting. Always check the official documents before you bid.